arXiv · 1411.5540
Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC
Abstract
In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated beam. Also, the possibility of achieving a few to multi-MW beam operation is discussed in detail.
Explore related subjects
Keep this discovery
Taku Ishida. 2014-11-20. Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC. https://arxiv.org/abs/1411.5540
Cite the original work for its findings. Save a collection to share your selection of sources.