arXiv · 1502.01703
Status of the warm front end of PXIE
Abstract
A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.
Explore related subjects
Keep this discovery
A. Shemyakin, M. Alvarez, R. Andrews, C. Baffes, A. Chen, B. Hanna, L. Prost, G. Saewert, V. Scarpine, J. Steimel, D. Sun, D. Li, R. D'Arcy. 2015-02-05. Status of the warm front end of PXIE. https://arxiv.org/abs/1502.01703
Cite the original work for its findings. Save a collection to share your selection of sources.