SearcharxivSearch

arXiv subjects

R. Andrews

Publications and source records attributed to R. Andrews.

At least 19 recordsLinked to original sources

The X-ray Emissivity of Low-Density Stellar Populations

The dynamical production of low-mass X-ray binaries and brighter cataclysmic variables (CVs) in dense globular clusters is well-established. We investigate how the X-ray emissivity of fainter X-ray binaries (principally CVs and coronally active binaries) varies between different environments. We compile calculations (largely from the literature) of the X-ray emissivity of old stellar populations, including open and globular clusters and several galaxies. We investigate three literature claims of unusual X-ray sources in low-density stellar populations. We show that a suggested quiescent neutron star in the open cluster NGC 6819 is a foreground M dwarf. We show that the suggested diffuse X-ray emission from an old nova shell in the globular cluster NGC 6366 is actually a background galaxy cluster. And we show that a suggested population of quiescent X-ray binaries in the Sculptor Dwarf Galaxy is mostly (perhaps entirely) background galaxies. We find that above densities of $10^4$ M$_{\odot}$/pc$^3$, the X-ray emissivity of globular clusters increases, due to dynamical production of X-ray emitting systems. Below this density, globular clusters have lower X-ray emissivity than the other populations, and we do not see a strong dependence of X-ray emissivity due to density effects. We find significant correlations between X-ray emissivity and binary fraction, metallicity, and density. Sampling these fits via bootstrap techniques gives less significant correlations, but confirms the effect of metallicity on low-density populations, and that of density on the full globular cluster sample.

astro-ph.HE

Test Results of PIP2IT MEBT Vacuum Protection System

The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a vacuum failure occurs in the warm front end, a vacuum protection system is envisioned to be used in the PIP-II MEBT. It features a fast closing valve with two sensors and a differential pumping insert. The system prototype was installed in the PIP-II Injector Test (PIP2IT) accelerator and successfully tested in several modes modelling the vacuum failures. The report presents the design of the vacuum protection system and results of its tests.

physics.acc-ph

PIP-II Injector Test Warm Front End: Commissioning Update

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

physics.acc-ph

Status of the warm front end of PIP-II injector test

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.

physics.acc-ph

Design Of The LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward the Deep Underground Neutrino Experiment (DUNE) detectors, placed deep underground at the SURF Facility in Lead, South Dakota. The primary proton beam (60-120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos will be produced when the protons interact with a solid target to produce mesons which will be subsequently focused by magnetic horns into a 194m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spatial and radiological constraints, and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.

physics.acc-ph

Installation Progress At The PIP-II Injector Test At Fermilab

A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.

physics.acc-ph

A biological model of scabies infection dynamics and treatment explains why mass drug administration does not lead to elimination

Despite a low global prevalence, infections with Sarcoptes scabiei, or scabies, are still common in remote communities such as in northern Australia and the Solomon Islands. Mass drug administration (MDA) has been utilised in these communities, and although prevalence drops substantially initially, these reductions have not been sustained. We develop a compartmental model of scabies infection dynamics and incorporate both ovicidal and non-ovicidal treatment regimes. By including the dynamics of mass drug administration, we are able to reproduce the phenomena of an initial reduction in prevalence, followed by the recrudescence of infection levels in the population. We show that even under a `perfect' two-round MDA, eradication of scabies under a non-ovicidal treatment scheme is almost impossible. We then go on to consider how the probability of elimination varies with the number of treatment rounds delivered in an MDA. We find that even with infeasibly large numbers of treatment rounds, elimination remains challenging.

q-bio.PE

Mechanical stability study for Integrable Optics Test Accelerator at Fermilab

The Integrable Optics Test Accelerator (IOTA) is proposed for operation at Fermilab. The goal of IOTA is to create practical nonlinear accelerator focusing systems with a large frequency spread and stable particle motion. The IOTA is a 40 m circumference, 150 MeV (e-), 2.5 MeV (p+) diagnostic test ring. A heavy low frequency steel floor girder is proposed as the primary tier for IOTA device component support. Two design lengths; (8) 3.96 m and (2) 3.1 m long girders with identical cross section completely encompass the ring. This study focuses on the 3.96 m length girder and the development of a working prototype. Hydrostatic Level Sensor (HLS), temperature, metrology and fast motion measurements characterize the anticipated mechanical stability of the IOTA ring.

physics.acc-ph

Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) Conceptual Design Report Volume 1: The LBNF and DUNE Projects

This document presents the Conceptual Design Report (CDR) put forward by an international neutrino community to pursue the Deep Underground Neutrino Experiment at the Long-Baseline Neutrino Facility (LBNF/DUNE), a groundbreaking science experiment for long-baseline neutrino oscillation studies and for neutrino astrophysics and nucleon decay searches. The DUNE far detector will be a very large modular liquid argon time-projection chamber (LArTPC) located deep underground, coupled to the LBNF multi-megawatt wide-band neutrino beam. DUNE will also have a high-resolution and high-precision near detector.

physics.ins-det

Pxie low energy beam transport commissioning

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the front-end of such machine, a test accelerator (a.k.a. PXIE) is under construction. It includes a 10 mA DC, 30 KeV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to ~25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source and LEBT, which includes 3 solenoids, several clearing electrodes/collimators and a chopping system, have been built, installed, and commissioned to full specification parameters. This report presents the outcome of our commissioning activities, including phase-space measurements at the end of the beam line under various neutralization schemes obtained by changing the electrodes' biases and chopper parameters.

physics.acc-ph

The NuMI Neutrino Beam

This paper describes the hardware and operations of the Neutrinos at the Main Injector (NuMI) beam at Fermilab. It elaborates on the design considerations for the beam as a whole and for individual elements. The most important design details of individual components are described. Beam monitoring systems and procedures, including the tuning and alignment of the beam and NuMI long-term performance, are also discussed.

physics.acc-ph

PSR J1930-1852: a pulsar in the widest known orbit around another neutron star

In the summer of 2012, during a Pulsar Search Collaboratory workshop, two high-school students discovered J1930$-$1852, a pulsar in a double neutron star (DNS) system. Most DNS systems are characterized by short orbital periods, rapid spin periods and eccentric orbits. However, J1930$-$1852 has the longest spin period ($P_{\rm spin}\sim$185 ms) and orbital period ($P_{\rm b}\sim$45 days) yet measured among known, recycled pulsars in DNS systems, implying a shorter than average and/or inefficient recycling period before its companion went supernova. We measure the relativistic advance of periastron for J1930$-$1852, $\dotω=0.00078$(4) deg/yr, which implies a total mass (M$_{\rm{tot}}=2.59$(4) M$_{\odot}$) consistent with other DNS systems. The $2σ$ constraints on M$_{\rm{tot}}$ place limits on the pulsar and companion masses ($m_{\rm p}<1.32$ M$_{\odot}$ and $m_{\rm c}>1.30$ M$_{\odot}$ respectively). J1930$-$1852's spin and orbital parameters challenge current DNS population models and make J1930$-$1852 an important system for further investigation.

astro-ph.HE

Design of the LBNE Beamline

The Long Baseline Neutrino Experiment (LBNE) will utilize a beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a wide band beam of neutrinos toward a detector placed at the Sanford Underground Research Facility in South Dakota, about 1,300 km away. The main elements of the facility are a primary proton beamline and a neutrino beamline. The primary proton beam (60 -120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are sign selected and subsequently focused by a set of magnetic horns into a 204 m long decay pipe where they decay mostly into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~1.2 MW, however the facility is designed to be upgradeable for 2.3 MW operation. We discuss here the status of the design and the associated challenges.

physics.acc-ph

Status of the warm front end of PXIE

A CW-compatible, pulsed H- superconducting linac is envisaged as a possible path for upgrading Fermilab's injection complex. To validate the concept of the front- end of such a machine, a test accelerator (a.k.a. PXIE) is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report commissioning results of a partially assembled LEBT, status of RFQ manufacturing, and describe development of the MEBT, in particular, of elements of its chopping system.

physics.acc-ph

Status of the Design of the LBNE Neutrino Beamline

The Long Baseline Neutrino Experiment (LBNE) will utilize a neutrino beamline facility located at Fermilab to carry out a compelling research program in neutrino physics. The facility will aim a beam of neutrinos toward a detector placed at the Homestake Mine in South Dakota, about 1300 km away. The neutrinos are produced as follows: First, protons extracted from the MI-10 section of the Main Injector (60-120 GeV) hit a solid target above grade and produce mesons. Then, the charged mesons are focused by a set of focusing horns into a 250 m long decay pipe, towards the far detector. Finally, the mesons that enter the decay pipe decay into neutrinos. The parameters of the facility were determined taking into account several factors including the physics goals, the modeling of the facility, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The initial beam power is expected to be ~700 kW, however some of the parameters were chosen to be able to deal with a beam power of 2.3 MW in order to enable the facility to run with an upgraded accelerator complex. We discuss here the status of the design and the associated challenges.

physics.acc-ph