arXiv · 1701.01078
Installation Progress At The PIP-II Injector Test At Fermilab
Abstract
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.
Explore related subjects
Keep this discovery
C. Baffes, M. Alvarez, R. Andrews, A. Chen, J. Czajkowski, P. Derwent, J. Edelen, B. Hanna, B. Hartsell, K. Kendziora, D. Mitchell, L. Prost, V. Scarpine, A. Shemyakin, J. Steimel, T. Zuchnik, A. Edelen. 2017-01-04. Installation Progress At The PIP-II Injector Test At Fermilab. https://arxiv.org/abs/1701.01078
Cite the original work for its findings. Save a collection to share your selection of sources.