SearcharxivSearch

arXiv · 1806.08046

Design and Evaluation of LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade

Abstract

The LHC upgrade is planned to enhance the instantaneous luminosity during Run 3 from 2021 through 2023. The Phase-I upgrade of the trigger readout electronics for the ATLAS Liquid Argon (LAr) Calorimeters will be installed during the second long shutdown of LHC in 2019-2020. In this upgrade, the so-called super cells are introduced to provide higher granularity, higher resolution and longitudinal shower shape information from the LAr calorimeters to the level-1 trigger processors. A new LAr Trigger Digitizer Board (LTDB) will manipulate and digitize 320 channels of super cell signals, and transmit it via 40 fiber optical links to the back end where data are further processed and transmitted to the trigger processors. Five pairs of bidirectional GBT links are used for slow control from the Front-end LInks eXchange (FELIX) in the ATLAS TDAQ system. LTDB also outputs 64 summed analog signals to the current Tower Builder Board via the new baseplane. A test system is developed to test all functions of the LTDB and carry out the performance measurement. A back end PCIe card is designed which has the circuit to interface to the ATLAS trigger, time and control system. It can control the generation of injection signals to the LTDB for performance test. It also configures and calibrate all ASICs on the LTDB.

Explore related subjects

Keep this discovery

BibTeXRIS

Kai Chen, Hucheng Chen, Mauro Citterio, Herve Deschamps, Aude Grabas, Stefano Latorre, Massimo Lazzaroni, Hongbin Liu, Phillippe Schwemling, Stefan Simion, Hao Xu, Heling Zhu. 2018-06-21. Design and Evaluation of LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade. https://arxiv.org/abs/1806.08046

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

High-Speed Semi-FE Readout Module for ATLAS MDT at HL-LHC: Design and Production-Level Characterization

The High-Luminosity upgrade of the Large Hadron Collider (HL-LHC) introduces increased demands on the ATLAS Muon Spectrometer, particularly in terms of data throughput, timing distribution and system reliability. The Phase-II Chamber Service Module (CSM) is a key component of the upgraded Monitored Drift Tube (MDT) trigger and readout system, providing a high-speed interface between the front-end electronics and the backend systems. This paper describes the design and implementation of the Phase-II CSM, together with its validation. The results show that the CSM supports two independent optical uplinks, each operating at a line rate of 10.24 Gbps, together with clock distribution and slow control in the expected operating environment. Integration with small-diameter MDT (sMDT) chambers and tests with the prototype L0MDT trigger system are also presented. The CSM boards are now in production and will be used for installation and integration during the upcoming LHC Long Shutdown.

physics.ins-det

Spectral Discrimination of Deposited Gamma-Ray Energies in a Simulated CeBr$_3$ Scintillator

We show that wavelength measurements of individual detected optical photons may provide additional information about gamma-ray energy deposited in a CeBr$_3$ crystal when the detected-photon-count distributions overlap for nearby gamma-ray energies. Monoenergetic 662 and 629 keV gammas are used in a Geant4 simulation of a $25\times25\times20~\mathrm{mm^3}$ CeBr$_3$ crystal. Assuming a light yield of $6.0\times10^4$ photons/MeV, a wavelength-independent photon-detection efficiency of 30%, and a wavelength resolution of $\sigma_{\lambda}=40$ nm, we find that the fraction of photons reconstructed above 385 nm gives an event-level separation of $\sim$ 2 standard deviations between the 662 and 629 keV event populations selected within the same $\sim$ 1%-wide detected-photon-count interval. No timing or reconstructed interaction-position information is used. The result demonstrates, within the present simulation model, that event-dependent optical spectra can retain energy information beyond an undifferentiated photon count.

physics.ins-det

Operation of a negative ion gas time projection chamber without electronegative fill gases

The high fidelity reconstruction of particle tracks in micropatterned gaseous time projection chambers renders this technology ideal for future rare-event searches, including direction-sensitive dark matter experiments. Large drift distances are typically required for such experiments, so that the overall spatial resolution is limited by diffusion. Negative ion drift exhibits lower diffusion than electron drift and is thus an attractive option for realising a large-scale detector. The use of electronegative gases to create negative ions introduces technical challenges, most notably a reduction in gain when compared to conventional gas mixtures. In this study, we demonstrate a new method for negative ion generation via dissociative electron attachment using the conventional molecular fill gas CF$_4$. Our optical measurements of negative ion drift indicate electron attachment lengths of $<$1 mm and comparable gain to electron avalanches. The individual negative ion avalanches were also time-resolved, allowing the number of ions reaching the readout to be counted. We measure an improved energy resolution by single ion counting, relative to an integrated electron avalanche signal measured under identical gain conditions.

physics.ins-det