arXiv · 2301.13299
CMS Tracker Alignment Activities during LHC Long Shutdown 2
Abstract
The strategies for and the performance of the CMS tracker alignment during the 2021-2022 LHC commissioning preceding the Run 3 data-taking period are described. The results of the very first tracker alignment after the pixel reinstallation, performed with cosmic ray muons recorded with the solenoid magnet off are presented. Also, the performance of the first alignment of the commissioning period with collision data events, collected at center-of-mass energy of 900 GeV, is presented. Finally, the tracker alignment effort during the final countdown to LHC Run 3 is discussed.
Explore related subjects
Keep this discovery
Sandra Consuegra Rodríguez. 2023-01-30. CMS Tracker Alignment Activities during LHC Long Shutdown 2. https://doi.org/10.22323/1.414.0633
Cite the original work for its findings. Save a collection to share your selection of sources.