SearcharxivSearch

arXiv · 2401.07715

The PRL 2.5m Telescope and its First Light Instruments: FOC & PARAS-2

Abstract

We present here the information on the design and performance of the recently commissioned 2.5-meter telescope at the PRL Mount Abu Observatory, located at Gurushikhar, Mount Abu, India. The telescope has been successfully installed at the site, and the Site Acceptance Test (SAT) was completed in October 2022. It is a highly advanced telescope in India, featuring the Ritchey-Chr$\acute{e}$tien optical configuration with primary mirror active optics, tip-tilt on side-port, and wave front correction sensors. Along with the telescope, its two first light instruments {namely Faint Object Camera (FOC) and PARAS-2} were also integrated and attached with it in the June 2022. {FOC is a} camera that uses a 4096 X 4112 pixels detector SDSS type filters with enhanced transmission and known as u', g', r', i', z'. It has a limiting magnitude of 21 mag in 10 minutes exposure in the r'-band. The other first light instrument PARAS-2 is a state-of-the-art high-resolution fiber-fed spectrograph operates in 380-690 nm wave-band, aimed to unveil the super-Earth like worlds. The spectrograph works at a resolution of $\sim$107,000, making it the highest-resolution spectrograph in Asia to date, which is under {ultra}-stable temperature and pressure environment, at 22.5 $\pm$ 0.001 $^{\circ}$C and 0.005 $\pm$ 0.0005 mbar, respectively. Initial calibration tests of the spectrograph using a Uranium Argon Hollow Cathode Lamp (UAr HCL) have yielded intrinsic instrumental RV stability down to 30 cm s$^{-1}$.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Abhijit Chakraborty, Kapil Kumar Bharadwaj, Neelam J. S. S. V. Prasad, Rishikesh Sharma, Kevikumar A. Lad, Ashirbad Nayak, Nikitha Jithendran, Vishal Joshi, Vivek Kumar Mishra, Nafees Ahmed. 2024-01-15. The PRL 2.5m Telescope and its First Light Instruments: FOC & PARAS-2. https://doi.org/10.25518/0037-9565.11602

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

The EDD Radio Astronomy Backend Framework

Modern digital radio astronomy receivers produce increasingly wide-bandwidth, high bit-rate data streams that necessitate the development of flexible, scalable, and maintainable backend processing and recording systems. Historically, such backend instrumentation has been tightly coupled to telescope observing modes, limiting reuse between observatories and science cases. We present the Effelsberg Direct Digitisation (EDD) backend framework, a software-defined architecture for constructing real-time radio astronomy backends on commodity off-the-shelf computing infrastructure. We describe its design, implementation, supported observing modes, and operational deployments. EDD separates a common core framework from plugin-provided observing capabilities. The core provides orchestration, telescope interfaces, pipeline lifecycle management, monitoring, and deployment tooling, while plugins implement processing pipelines for specific observing modes. The framework is designed to support both single-dish and interferometric instruments through site-specific configuration and plugin selection. EDD currently supports spectroscopy and spectropolarimetry, pulsar timing and searching, baseband recording, very long baseline interferometry, correlation, and beamforming. Operational deployments include the Effelsberg 100-m telescope, the SKA-MPI prototype dish, the Thai National Radio Telescope, and the ARGOS interferometric prototype array. By separating common services, observing-mode plugins, and site-specific configuration, it allows backend capabilities to be deployed across heterogeneous telescope environments and provides a community resource for broadband radio astronomy instrumentation.

astro-ph.IM

Bayesian Superiority in On/Off analysis

We present a detailed comparison of Bayesian criteria with three non-informative priors - flat, Jeffreys, and scale-invariant - for testing a signal against an unknown background and compare them with the classical frequentist Li-Ma approach in the On/Off problem. We perform Monte Carlo simulations for various background levels and evaluate the Li-Ma and Bayesian criteria by their Type I error rates. We then simulate a nonzero signal and compare the criteria in terms of Type II error rates. We find that the Bayesian criterion with the Jeffreys prior yields lower Type I and Type II error rates than the Li-Ma criterion. In addition, we show that the Bayesian criteria are more robust than the Li-Ma criterion when the background distribution is overdispersed relative to the Poisson distribution.

astro-ph.IM

An RFSoC-based Backend and Timing System for the Balloon-borne Very Long Baseline Interferometry Experiment

We present the design and performance characterization of the digital backend and precision-timing system for the Balloon-borne Very Long Baseline Interferometry Experiment (BVEX), a pathfinder for high-frequency stratospheric VLBI at 22 GHz. The backend uses one of the four 14-bit analog-to-digital converter inputs on an AMD-Xilinx RFSoC 4x2. Although the converters support sampling rates up to 5 GSPS, the flight configuration digitizes the 2-4 GHz intermediate frequency at 4.096 GSPS. CASPER firmware provides both a high-resolution spectrometer for pointing and receiver verification, and a VLBI acquisition chain with two-bit requantization that records at a rate of about 8.2 Gbps. The timestamped data packets are sent over 100 Gigabit Ethernet (GbE) to a 16 TB NVMe array in a storage computer that draws approximately 70-80 W. The timing chain uses a Rakon oven-controlled crystal oscillator as a timing reference while a time-interval counter measures its drift relative to a GPS reference with approximately 60 ps resolution. This is the first deployment of an RFSoC-based VLBI backend and precision-timing system on a stratospheric balloon. Ground tests validated the backend, spectrometer, and timing chain. The August 2025 CSA STRATOS flight ended before reaching the target float altitude because of a balloon failure, and as a result no science observations were obtained. For the planned 2027 reflight, we are developing a conduction-cooled data storage computer with 24 TB of NVMe capacity and a direct data path from the 100 GbE interface to the NVMe array.

astro-ph.IM