The Latency Validation of the Optical Link for the ATLAS Liquid Argon Calorimeter Phase-I Trigger Upgrade
Abstract
Two optical data link data transmission Application Specific Integrated Circuits (ASICs), the baseline and its backup, have been designed for the ATLAS Liquid Argon (LAr) Calorimeter Phase-I trigger upgrade. The latency of each ASIC and that of its corresponding receiver implemented in a back-end Field-Programmable Gate Array (FPGA) are critical specifications. In this paper, we present the latency measurements and simulation of two ASICs. The measurement results indicate that both ASICs achieve their design goals and meet the latency specifications. The consistency between the simulation and measurements validates the ASIC latency characterization.
Explore related subjects
Keep this discovery
Binwei Deng, Le Xiao, Xiandong Zhao, Emily Baker, Datao Gong, Di Guo, Huiqin He, Suen Hou, Chonghan Liu, Tiankuan Liu, Quan Sun, James Thomas, Jian Wang, Annie C. Xiang, Dongxu Yang, Jingbo Ye, Wei Zhou. 2020-09-14. The Latency Validation of the Optical Link for the ATLAS Liquid Argon Calorimeter Phase-I Trigger Upgrade. https://doi.org/10.1088/1748-0221/13/05/p05002
Cite the original work for its findings. Save a collection to share your selection of sources.