SearcharxivSearch

arXiv · 2408.01074

Design, development, and construction of the new beam stoppers for CERN's injector complex

Abstract

Beam stoppers are installed in the transfer lines of the CERN accelerator complex; these components are used as part of the access safety system, which guarantees the safety of workers in the accelerators. They are designed to stop one or at most a few pulses of the beam, where "stop" means the partial or complete absorption of the primary beam in such a way that the remaining unabsorbed primary or secondary beam remains below a specified threshold, as defined by the needs of radiation protection. Prior to Long Shutdown 2 (LS2; 2018--2021), beam stoppers in the injector complex were dimensioned for beam-pulse energies between 9.0 and 30~kJ. The upgrade of the accelerator complex in the framework of the LHC Injectors Upgrade (LIU) project involves beam-pulse energies of up to 92.5~kJ, meaning that these beam stoppers are not able to fulfill the new functional specifications. To cope with the LIU beam parameters and fulfil requirements for safety, maintainability, efficiency, and reliability, a new generation of 28 beam stoppers has been designed, built, and installed. The aim of this paper is to demonstrate the requirements-driven design of these new beam stoppers, outlining the main requirements along with a description of the design and structural assessments. This document presents the implementation and integration of a standardized but adaptable design using a unique 564-mm-long stopper core with a CuCr1Zr absorber and an Inconel~718 diluter, taking into account radiological and infrastructure challenges. The installation process is also described, and the first operational feedback received since LS2 is presented.

Explore related subjects

Keep this discovery

BibTeXRIS

D. Baillard, E. Grenier-Boley, M. Dole, F. Deslande, R. Froeschl, T. Lorenzon, P. Moyret, R. Peron, A. Pilan Zanoni, C. Sharp, M. Timmins, M. Calviani. 2024-08-02. Design, development, and construction of the new beam stoppers for CERN's injector complex. https://arxiv.org/abs/2408.01074

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related papers

Production of Light Nuclei and Hypernuclei in Heavy-Ion Collisions

We review recent STAR and ALICE measurements of light-nucleus and hypernucleus yields, femtoscopic correlations, and collective flow presented at SQM 2026. Statistical-hadronization calculations provide a useful baseline for integrated yields but do not simultaneously describe all measured light-nucleus ratios across collision energies and system sizes. For bound states with mass number $A<4$, current coalescence calculations provide a broadly consistent description of yields, femtoscopic correlations, and collective flow, although the quantitative hypertriton comparison depends on the assumed few-body wave function. The suppressed production of resonant $^{4}$Li relative to compact $^{4}$He indicates an effect of nuclear structure and late-stage dynamics. However, the quantitative model comparison also depends on the treatment of feed-down from unstable states. In high-multiplicity $p$+$p$ collisions, pion-deuteron femtoscopy further indicates that most observed (anti)deuterons are formed through nucleon fusion after strong decays of short-lived resonances. Taken together, these measurements show that production chronology and internal nuclear structure leave measurable imprints on the physics observables.

hep-ex

Search for the process $e^+e^-\to f_1(1285)$ at the SND detector

In the experiment with the SND detector at the VEPP-2000 $e^+e^-$ collider, a search is performed for the direct production of the $C$-even $f_1(1285)$ resonance in $e^+e^-$ collisions. The analysis is based on data with an integrated luminosity of about 200 pb$^{-1}$, accumulated in the center-of-mass energy range of 1.14--1.46 GeV, of which about 72 pb$^{-1}$ were recorded near the maximum of the $f_1(1285)$ resonance. The $f_1(1285)$ production cross section at the resonance maximum $\sigma(e^+e^-\to f_1)=(31\pm 13\pm 2)$ pb and the branching fraction $B(f_1(1285)\to e^+e^-)=(3.5\pm 1.4\pm 0.3)\times 10^{-9}$ have been measured. The significance of the observation of the $e^+e^-\to f_1(1285)$ process is $2.5\sigma$. Since the significance is low, we also present the upper limits at the 90% confidence level: $\sigma(e^+e^-\to f_1)<48\mbox{ pb}$ and $B(f_1(1285)\to e^+e^-)<5.4\times 10^{-9}$.

hep-ex

Projected Sensitivity to Slow Muonphilic Dark Matter with Accelerator Muon Beams

The nature of dark matter (DM) remains one of the most enduring open questions in modern physics, and muonphilic DM has emerged as a promising scenario that complements traditional DM candidates. Following the recently established cosmic-ray muon scattering approach, we investigate the sensitivity for probing slow muonphilic DM with accelerator muon beams. A Geant4-based simulation framework is developed, incorporating the detector geometry from the PKMu muon tomography system and a dedicated elastic $\mu$-DM scattering process. The projected sensitivity is found to be largely insensitive to both the beam energy and the transverse beam size when the beam is fully contained within the detector acceptance. For a benchmark beam intensity of $10^5/\rm{s}$, the simulated pure-muon beam surpasses the existing cosmic-ray limit of $1.61\times10^{-17}$ cm$^2$ at $m_{\rm DM}=1$ GeV within approximately 11 seconds. A realistic muon beam phase-space distribution based on simulations for the High Intensity heavy-ion Accelerator Facility (HIAF) is also implemented, yielding projected limits that improve upon the cosmic-ray results by nearly two orders of magnitude in a one-day exposure. These results demonstrate that a beam-muon scattering experiment offers a robust and promising route toward significantly improved sensitivity to slow muonphilic DM.

hep-ex