arXiv · 2410.23833
Performance tests and hardware qualification of the FEBs for the Super-FGD of T2K Phase II
Abstract
T2K is a long baseline neutrino experiment, entering Phase II with a Near Detector upgrade. The T2K near detector (ND280) upgrade consists of the installation of three new detector systems: a plastic scintillator neutrino active target (Super-FGD), two time projection chambers (HA-TPC) and a time of flight detector (TOF). The Super-FGD is composed of 2-million 1 cm-cube scintillating cubes read by almost 60 thousand wavelength-shifting (WLS) fibers coupled to an MPPC on one end. Given the large number of channels, the limited space inside magnetic environment, and the limited time from production to installation, the development and testing of the Front-end electronics boards (FEB) for the read-out of the Super-FGD channels represented a challenging task for the success of the upgrade. This work presents the performance tests confirming that the FEB aligns with detector requirements, and the hardware qualification of 240 FEBs through a custom QC test bench designed to detect and locate hardware failures to speed up the repairing process. Installation of the electronics in the detector took place in March 2024, one year after the beginning of the FEB mass production, and the first successful neutrino beam run took place in June of the same year.
Explore related subjects
Keep this discovery
Lorenzo Giannessi, Franck Cadoux, Sebastien Cap, Jaafar Chakrani, Olivier Drapier, Yannick Favre, Franck Gastaldi, Mahesh Jakkapu, Jerome Nanni, Ken Sakashita, Federico Sánchez. 2024-10-31. Performance tests and hardware qualification of the FEBs for the Super-FGD of T2K Phase II. https://doi.org/10.1088/1748-0221%2F20%2F01%2Fc01043
Cite the original work for its findings. Save a collection to share your selection of sources.