arXiv · 2108.04185
Quality control tests of the front-end optical link components for the ATLAS Liquid Argon Calorimeter Phase-1 upgrade
Abstract
We present the procedures and results of the quality control tests for the front-end optical link components in the ATLAS Liquid Argon Calorimeter Phase-1 upgrade. The components include a Vertical-Cavity Surface-Emitting Laser (VCSEL) driver ASIC LOCld, custom optical transmitter/transceiver modules MTx/MTRx, and a transmitter ASIC LOCx2. LOCld, MTx, and LOCx2 each contain two channels with the same structure, while MTRx has a transmitter channel and a receiver channel. Each channel is tested at 5.12 Gbps. A total of 5341 LOCld chips, 3275 MTx modules, 797 MTRx modules, and 3198 LOCx2 chips are qualified. The yields are 73.9%, 98.0%, 98.4%, and 61.9% for LOCld, LOCx2, MTx, and MTRx, respectively.
Explore related subjects
Keep this discovery
B. Deng, J. Thomas, L. Zhang, E. Baker, A. Barsallo, M. L. Bleile, C. Chen, I. Cohen, E. Cruda, J. Fang, N. Feng, D. Gong, S. Hou, X. Huang, T. Lozano-Brown, C. Liu, T. Liu, A. Muhammad, L. A. Murphy, P. M. Price, J. H. Ray, C. Rhoades, A. H. Santhi, D. Sela, H. Sun, J. Wang, Z. Wang, L. Xiao, W. Zhang, X. Zhao, J. Ye. 2021-08-09. Quality control tests of the front-end optical link components for the ATLAS Liquid Argon Calorimeter Phase-1 upgrade. https://doi.org/10.1088/1748-0221/16/08/p08006
Cite the original work for its findings. Save a collection to share your selection of sources.